Index About Us Products Odds News Cases Join Us Message Contact
中文
Notice: Qingdao Bioko Equipment Engineering Co., Ltd. is located in the beautiful coastal city - Qingdao, the location, the revolving door is a professional research and development of automatic doors, security doors, special doors, intelligent building systems development, production, sales and service in one business ...
Revolving Door
Two Wings Revolving Door
Three/Four Wings Revolving Door
Crystal Revolving Door
Sliding Door
Automatic Sliding Door
Arc Automatic Door
Airtight door
Partition and Sliding Door
Kentucky Bronze Door
Intelligent Channel System
Three Roller Gates
Swing Gate
Wing Gate
Tel:00532-82009806
Fax:00532-87636357
Addr:Qingdao Chengyang Liuting Industrial Park East
Email:info@qingdaoaoke.com
News
Sensing automatic sliding door Installation Guide

1, the installation of an aluminum alloy casing beams, please note so that it remains level, the error of 1mm, if not the level of force will lead to uneven phenomenon occurs when walking door, causing reduced life of the machine.
2, door hanging installation: hanging bolt assembly of the hanger device is attached to the specified location on the door that comes with the door. Should be installed so that the center of the pulley and door hanger means in a parallel state, if not parallel, will shorten the life of the pulley. The pulley hanging device linked to the power beam. Do bumps and other parts of the beam power rails within the installation, which will cause component failure or pulley life, noise, and other unusual sounds.
3, the stopper Installation: Tighten mounting bolts loosen the stopper. The stopper means determines embedded into the rail power beam. First, determine the moving door open and closed positions of the door, and then determine the position of the stopper. * When the position setting limiter device should be hanging device's touch pad stop after stop. With a hex wrench to tighten indeed fixed mounting bolts.
4, height and gap adjustment of the door: Loosen the hanger nut. Adjust adjusting bolt security. Fasten the hanger nut. Confirm resistance when walking. Confirm door move is not Zhizhong phenomenon, and there is no friction sound, if there is a problem, please check the following matters: whether hanging vertically fixed to the door if the power beam suspension means there is friction between the door and door frame friction Fixed fan and the ground level is generally maintained at 10mm. The gap between the movable and fixed fan fan 5mm.
5, adjust the belt tension: the tension pulley device left pull, keeping the belt tight, then tighten the four plate bolts. Loosen the four adjustment bolts clockwise rotation tension adjustment screw to adjust the belt tension.
6, the installation to the wheel when the wheel is installed according to the center position to move half the fan width of the door plus 5mm. (Provided in the bottom of the slide moving fan, if not direct the slide trim package should be considered in the space inside the distance, the actual calculated based) After installation, ensure that the same door and down the gap, so as not to damage a long time ground round.
7, the control system to adjust :( under normal circumstances do not have to adjust, keep the factory setting as well) before adjusting push the door by hand several times to move the fan door can assure a smooth switch. Setting about the switch, according to the opening direction of the door, set the left or right. When is a double door, switch on the right. Set the sensing mode, when the right side of the switch for the first induction method, on the left, the secondary induction method. When the door is closed after the turn on the power switch. On the control box knob adjustment: the premise is pressing the test button on the control box at the same time closing the door, adjust each item. Adjust the intensity of the start: its efforts to ensure the freedom to make the door switch. Adjust the opening speed and opening buffer distance: A, confirm whether the door speed is in the middle (the factory setting) in the middle and the buffer distance B, adjust the door buffer distance, to set it at between 10-20 cm. C, adjust the opening speed, confirmed opening speed of the door, open the door in the adjustment buffer distance.

About Us   |  Products  |  Advantages  |  News  |  Cases  |  Join Us   |  Message  |  Contact
© Qingdao Aokeer Equipment Engineering Co. Ltd. Add: Chengyang Liuting Industrial Park East

Tel:0532-82009806 13969785179 Fax:0532-87636357 Email:info@qingdaoaoke.com